MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA

You have 10 free previews remaining
Previews reset on: Oct 31, 2025
Preview attempts remaining: 10 10 remaining

📄 Project Abstract

Following widespread acceptance by researchers that the effects of qualitative/managerial construction time-influencing factors need to be considered in project scope-based construction time predicting models, several multivariate models combining project scope and qualitative/managerial factors have been developed. However, it has been shown in literature that the applicability of these models is clearly limited to the regions/countries where they were developed. This study was therefore aimed at developing a multivariate construction time predicting model that will be applicable to the Nigeria construction industry. A self-administered questionnaire survey was used to source information on the quantitative (project scope) factors considered in the study as well as to assess the extent of influence of the qualitative factors on construction time. Principal component regression was used for the data analysis and model development, using SPSS 16.0 for windows. Following a non-normal dis...

🔍 Key Research Areas Covered
  • ✅ Literature Review & Theoretical Framework
  • ✅ Research Methodology & Data Collection
  • ✅ Data Analysis & Statistical Methods
  • ✅ Findings & Results Discussion
  • ✅ Recommendations & Conclusions
  • ✅ References & Bibliography
📚 Complete Project Structure
Chapter 1: Introduction & Background
  • Problem Statement & Objectives
Chapter 2: Literature Review
  • Theoretical Framework & Related Studies
Chapter 3: Research Methodology
  • Data Collection & Analysis Methods
Chapter 4: Data Analysis & Results
  • Findings & Statistical Analysis
Chapter 5: Discussion & Conclusion
  • Recommendations & Future Research
Appendices: Supporting Documents
  • Questionnaires, Data, References
⭐ Why Choose This Quantity Surveying Project Topics Project?
🎯 Well-Researched

Thoroughly researched with current and relevant sources

📊 Complete Data

Includes statistical analysis and detailed findings

✍️ Original Content

100% original research with proper citations

📝 Properly Formatted

APA/MLA formatting with table of contents

🎓 Supervisor Approved

Meets university standards and requirements

⚡ Instant Download

Immediate access after purchase

💬 What Students Say

"This project provided excellent guidance for my Quantity Surveying Project Topics research. The methodology was clear and the data analysis helped me understand the proper approach."

— Final Year Student, Environmental Science Project topics
Full Citation:

Hassan Adaviriku Ahmadu,. (). MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA. African and General Studies, 40, 14858.

Citation Formats:
APA
Hassan Adaviriku Ahmadu,. (). MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA. African and General Studies, 40, 14858.
MLA
Hassan Adaviriku Ahmadu,. "MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA." African and General Studies, vol. 40, , pp. 14858.
Chicago
Hassan Adaviriku Ahmadu,. "MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA." African and General Studies 40 (): 14858.
Full Citation:

Hassan Adaviriku Ahmadu,. (). MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA. African and General Studies, 40, 14858.

Citation Formats:
APA
Hassan Adaviriku Ahmadu,. (). MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA. African and General Studies, 40, 14858.
MLA
Hassan Adaviriku Ahmadu,. "MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA." African and General Studies, vol. 40, , pp. 14858.
Chicago
Hassan Adaviriku Ahmadu,. "MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA." African and General Studies 40 (): 14858.
Need Help?