A work management system for an IT development department

You have 10 free previews remaining
Previews reset on: Oct 31, 2025
Preview attempts remaining: 10 10 remaining

📄 Project Abstract

The objective of this project was to update an existing system for an IT development department, within a medium sized financial company in London, for whom I was a placement student last year (2000/2001). The system manages the company's IT development process, allowing for more efficient use of development resources. The first version of the software did not meet the company's requirements, so a study was started to gather a detailed list of requirements for the new system. This project follows on from this study, updating the system to the new requirements. Based upon my experience at the company, and resourcing information from the Internet, technical and functional aspects brought up in the requirements study have been looked into. It is advised that the reader look through Appendix E where the requirements study is to be found.

🔍 Key Research Areas Covered
  • ✅ Literature Review & Theoretical Framework
  • ✅ Research Methodology & Data Collection
  • ✅ Data Analysis & Statistical Methods
  • ✅ Findings & Results Discussion
  • ✅ Recommendations & Conclusions
  • ✅ References & Bibliography
📚 Complete Project Structure
Chapter 1: Introduction & Background
  • Problem Statement & Objectives
Chapter 2: Literature Review
  • Theoretical Framework & Related Studies
Chapter 3: Research Methodology
  • Data Collection & Analysis Methods
Chapter 4: Data Analysis & Results
  • Findings & Statistical Analysis
Chapter 5: Discussion & Conclusion
  • Recommendations & Future Research
Appendices: Supporting Documents
  • Questionnaires, Data, References
⭐ Why Choose This Information Systems Project Topics Project?
🎯 Well-Researched

Thoroughly researched with current and relevant sources

📊 Complete Data

Includes statistical analysis and detailed findings

✍️ Original Content

100% original research with proper citations

📝 Properly Formatted

APA/MLA formatting with table of contents

🎓 Supervisor Approved

Meets university standards and requirements

⚡ Instant Download

Immediate access after purchase

💬 What Students Say

"This project provided excellent guidance for my Information Systems Project Topics research. The methodology was clear and the data analysis helped me understand the proper approach."

— Final Year Student, Science project topics
Full Citation:

Luke Pennington. (). A work management system for an IT development department. African and General Studies, 40, 14858.

Citation Formats:
APA
Luke Pennington. (). A work management system for an IT development department. African and General Studies, 40, 14858.
MLA
Luke Pennington. "A work management system for an IT development department." African and General Studies, vol. 40, , pp. 14858.
Chicago
Luke Pennington. "A work management system for an IT development department." African and General Studies 40 (): 14858.
Full Citation:

Luke Pennington. (). A work management system for an IT development department. African and General Studies, 40, 14858.

Citation Formats:
APA
Luke Pennington. (). A work management system for an IT development department. African and General Studies, 40, 14858.
MLA
Luke Pennington. "A work management system for an IT development department." African and General Studies, vol. 40, , pp. 14858.
Chicago
Luke Pennington. "A work management system for an IT development department." African and General Studies 40 (): 14858.
Need Help?