A MODEL-VIEW-CONTROLLER BASED PLATFORM FOR THE MODELING AND SIMULATION OF THE HOIST SCHEDULING PROBLEM

You have 10 free previews remaining
Previews reset on: Oct 30, 2025
Preview attempts remaining: 10 10 remaining

📄 Project Abstract

The hoist scheduling problem is a critical issue in the design and control of many manufacturing processes. When the hoist number and tank numbers are very large, finding an optimal schedule is very hard. As a result of this, a lot of scheduling algorithms have been developed, and thus created a need to evaluate these algorithms. This calls for a cheap and efficient way of evaluating different hoist scheduling algorithms. To address this issue, I propose a generic simulator which will be a visual tool that will be developed with Java technology. The result of this work will help to reduce cost and also help to guarantee product quality in production lines.

🔍 Key Research Areas Covered
  • ✅ Literature Review & Theoretical Framework
  • ✅ Research Methodology & Data Collection
  • ✅ Data Analysis & Statistical Methods
  • ✅ Findings & Results Discussion
  • ✅ Recommendations & Conclusions
  • ✅ References & Bibliography
📚 Complete Project Structure
Chapter 1: Introduction & Background
  • Problem Statement & Objectives
Chapter 2: Literature Review
  • Theoretical Framework & Related Studies
Chapter 3: Research Methodology
  • Data Collection & Analysis Methods
Chapter 4: Data Analysis & Results
  • Findings & Statistical Analysis
Chapter 5: Discussion & Conclusion
  • Recommendations & Future Research
Appendices: Supporting Documents
  • Questionnaires, Data, References
⭐ Why Choose This Computer Science Project Topics Project?
🎯 Well-Researched

Thoroughly researched with current and relevant sources

📊 Complete Data

Includes statistical analysis and detailed findings

✍️ Original Content

100% original research with proper citations

📝 Properly Formatted

APA/MLA formatting with table of contents

🎓 Supervisor Approved

Meets university standards and requirements

⚡ Instant Download

Immediate access after purchase

💬 What Students Say

"This project provided excellent guidance for my Computer Science Project Topics research. The methodology was clear and the data analysis helped me understand the proper approach."

— Final Year Student, Science project topics
Full Citation:

ELEONU HENRY CHIKA. (). A MODEL-VIEW-CONTROLLER BASED PLATFORM FOR THE MODELING AND SIMULATION OF THE HOIST SCHEDULING PROBLEM. African and General Studies, 40, 14858.

Citation Formats:
APA
ELEONU HENRY CHIKA. (). A MODEL-VIEW-CONTROLLER BASED PLATFORM FOR THE MODELING AND SIMULATION OF THE HOIST SCHEDULING PROBLEM. African and General Studies, 40, 14858.
MLA
ELEONU HENRY CHIKA. "A MODEL-VIEW-CONTROLLER BASED PLATFORM FOR THE MODELING AND SIMULATION OF THE HOIST SCHEDULING PROBLEM." African and General Studies, vol. 40, , pp. 14858.
Chicago
ELEONU HENRY CHIKA. "A MODEL-VIEW-CONTROLLER BASED PLATFORM FOR THE MODELING AND SIMULATION OF THE HOIST SCHEDULING PROBLEM." African and General Studies 40 (): 14858.
Full Citation:

ELEONU HENRY CHIKA. (). A MODEL-VIEW-CONTROLLER BASED PLATFORM FOR THE MODELING AND SIMULATION OF THE HOIST SCHEDULING PROBLEM. African and General Studies, 40, 14858.

Citation Formats:
APA
ELEONU HENRY CHIKA. (). A MODEL-VIEW-CONTROLLER BASED PLATFORM FOR THE MODELING AND SIMULATION OF THE HOIST SCHEDULING PROBLEM. African and General Studies, 40, 14858.
MLA
ELEONU HENRY CHIKA. "A MODEL-VIEW-CONTROLLER BASED PLATFORM FOR THE MODELING AND SIMULATION OF THE HOIST SCHEDULING PROBLEM." African and General Studies, vol. 40, , pp. 14858.
Chicago
ELEONU HENRY CHIKA. "A MODEL-VIEW-CONTROLLER BASED PLATFORM FOR THE MODELING AND SIMULATION OF THE HOIST SCHEDULING PROBLEM." African and General Studies 40 (): 14858.
Need Help?