A CASE STUDY OF NATURAL FLOW AND TUBING STRING DESIGN FOR A WATER DRIVE RESERVOIR

You have 10 free previews remaining
Previews reset on:
Preview attempts remaining: 10 10 remaining

📄 Project Abstract

The design of natural flow and artificial lift tubing strings for the whole life of a water drive reservoir was carried out using data based on synthetic reservoir performance based on a material balance. The effects of reservoir properties on the life of the well was also investigated. Constraints such as maximum production, maximum drawdown, limitations on surface facilities capacities, as well as available gas lift was imposed. The production conditions for natural flow, continuous gas lift, and an ESP for later phases of the reservoir was designed and simulated along time by imposing either a constant flow rate or a constant bottom hole flowing pressure. A forecast of the production of oil and gas as well as the time where tubing strings should be replaced as a function of both the cumulative production and time was presented. The work was concluded by reservoir pressure was maintained much longer in comparison to other drive mechanism when there is an active water drive preferably...

🔍 Key Research Areas Covered
  • ✅ Literature Review & Theoretical Framework
  • ✅ Research Methodology & Data Collection
  • ✅ Data Analysis & Statistical Methods
  • ✅ Findings & Results Discussion
  • ✅ Recommendations & Conclusions
  • ✅ References & Bibliography
📚 Complete Project Structure
Chapter 1: Introduction & Background
  • Problem Statement & Objectives
Chapter 2: Literature Review
  • Theoretical Framework & Related Studies
Chapter 3: Research Methodology
  • Data Collection & Analysis Methods
Chapter 4: Data Analysis & Results
  • Findings & Statistical Analysis
Chapter 5: Discussion & Conclusion
  • Recommendations & Future Research
Appendices: Supporting Documents
  • Questionnaires, Data, References
⭐ Why Choose This Petroleum Engineering Project Topics Project?
🎯 Well-Researched

Thoroughly researched with current and relevant sources

📊 Complete Data

Includes statistical analysis and detailed findings

✍️ Original Content

100% original research with proper citations

📝 Properly Formatted

APA/MLA formatting with table of contents

🎓 Supervisor Approved

Meets university standards and requirements

⚡ Instant Download

Immediate access after purchase

💬 What Students Say

"This project provided excellent guidance for my Petroleum Engineering Project Topics research. The methodology was clear and the data analysis helped me understand the proper approach."

— Final Year Student, Engineering and Technology project topics
Full Citation:

Ojo, John Olatunde. (). A CASE STUDY OF NATURAL FLOW AND TUBING STRING DESIGN FOR A WATER DRIVE RESERVOIR. African and General Studies, 40, 14858.

Citation Formats:
APA
Ojo, John Olatunde. (). A CASE STUDY OF NATURAL FLOW AND TUBING STRING DESIGN FOR A WATER DRIVE RESERVOIR. African and General Studies, 40, 14858.
MLA
Ojo, John Olatunde. "A CASE STUDY OF NATURAL FLOW AND TUBING STRING DESIGN FOR A WATER DRIVE RESERVOIR." African and General Studies, vol. 40, , pp. 14858.
Chicago
Ojo, John Olatunde. "A CASE STUDY OF NATURAL FLOW AND TUBING STRING DESIGN FOR A WATER DRIVE RESERVOIR." African and General Studies 40 (): 14858.
Full Citation:

Ojo, John Olatunde. (). A CASE STUDY OF NATURAL FLOW AND TUBING STRING DESIGN FOR A WATER DRIVE RESERVOIR. African and General Studies, 40, 14858.

Citation Formats:
APA
Ojo, John Olatunde. (). A CASE STUDY OF NATURAL FLOW AND TUBING STRING DESIGN FOR A WATER DRIVE RESERVOIR. African and General Studies, 40, 14858.
MLA
Ojo, John Olatunde. "A CASE STUDY OF NATURAL FLOW AND TUBING STRING DESIGN FOR A WATER DRIVE RESERVOIR." African and General Studies, vol. 40, , pp. 14858.
Chicago
Ojo, John Olatunde. "A CASE STUDY OF NATURAL FLOW AND TUBING STRING DESIGN FOR A WATER DRIVE RESERVOIR." African and General Studies 40 (): 14858.
Need Help?